The table below lists 67 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. Lengths for France are recorded in metres which is how the operators publish them and why the shortest entry here reads as 1 014 m and not a rounded figure.
68 rows are rendered in total, so 1 of them carry a note or a blank where a length belongs and are shown without being counted. The middle half of the table runs from 1.45 km to 3.19 km, and that band is where most of the engineering on this page actually sits.
The median entry measures 1.87 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 1.01 km against 11.61 km at the top, a spread of 11.45x across the same table.
- 67entries listed
- 11.61 kmlongest bore
- 1882–2014openings span
- 124.42 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| State | Tunnel | Length (m) | Date of opening | Dep. | Notes | Route |
|---|---|---|---|---|---|---|
| F - I | Ciriegia - Mercantour | 17 300 | PRJ | 06 | Works stopped for environmental oppositions | |
| F - I | Fréjus | 12 898 12878 | 12.07.1980 2018 | 73 | In France 6575 m. Altitude: 1297 m. 2 nd tube under construction. Breakthrough on 17.11.2014 (traffic direction Italy - France) | RN566 |
| F - I | Mont Blanc / Monte Bianco | 11 611 | 19.07.1965 09.03.2002 | 74 | In France: 7640 m. Altitude: 1395.5 m (at portals: I 1381 m, F 1274 m) | RN205 |
| F | Duplex A86 | 10 100 | 08.01.2011 | 92-78 | Double deck configuration . | A86 |
| E - F | Somport | 8 608 | 17.01.2003 | 64 | In France: 2858 m, Altitude: (F portal: 1116 m) | RN134 |
| F | Rueil-Bailly (Tunnel Ouest) | 7 420 | PRJ | 92-78 | A86 | |
| F | Maurice Lemaire | 6 872 | 1976 | 88-68 | 1937-1976: Railway tunnel named St. Marie aux Mines . Parallel Emergency tunnel. Reopened 01.10.2008 | RN159 |
| F | Puymorens | 4 840 | 20.10.1994 | 09-66 | Altitude: 1515 m (northern portal) - 1560 m (southern portal). Near Spain border | RN20 |
| F | Bastille (Vercors) | 4 400 | PRJ | 38 | Second tube: 4400 m. Rocade Nord Grenoble. Gabarit 2,7 m | A41-A480 |
| F | Defense | 4 085 | 1996 | 92 | Second tube: 3950 m | A14 |
| F | Violay | 3 906 | 21.01.2013 | 42-69 | Second tube: 3906 m. Balbigny-La Tour de Salvagny | A89 |
| F | Faraut | 3 800 | PRJ | 05 | Second tube: 3800 m | A51 |
| F | Caluire | 3 728 | 1997 | 69 | Second tube: 3728 m (1999). Lyon North Peripherique | |
| F | Orelle | 3 692 | 2000 | 73 | Two lanes direction Fréjus, one lane direction Chambery | A43 |
| F | Roux | 3 336 | 1930 | 07 | RD160 | |
| F - I | New Col di Tenda (Tende) | 3 252 | PRJ | 06 | One way, direction France | RN204 |
| F | Chamoise | 3 300 | 1995 | 01 | Second tube: 3264 m (1986, north tube). Road signs: 3500-3500 m | A40 |
| F - I | Col De Tende | 3 186 | 1882 | 06 | In France: 1487 m. Altitude: 1321 m. In future: one way direction Italy | D6204 |
| F | L'Épine | 3 182 | 1974 | 73 | Second tube: 3092 m (1991 -south tube) | A43 |
| F | Mont Sion | 3 065 | 28.12.2008 | 74 | Second tube: 3065 m.Natural part: 2914 m. Annecy - Geneve | A41 |
| F - E | Aragnouet - Bielsa | 3 070 | 1976 | 65 | In France: 1772 m. Altitude: 1821 m | RD173 |
| F | Toulon | 2 969 | 19.09.2002 | 83 | Artificial parts: 1122 m, direction A50. Second tube: 3000 m (direction A57, 2014) | A57-A50 |
| ( F) - AND | Envalira | 2 879 | 26.09.2002 | 66 | With law-project no 290 of 12/9/2000, France has changed with Andorra 15595 m 2 of country to permit the realization of tunnel portal and viaduct | RN22 |
| F | Foret de Saint Germain | 2 810 | 1996 | 78 | Second tube: 2810 m | A14 |
| F | Liautaud | 2 770 | 06 | City of Nice | ||
| F | Semnoz | 2 700 | PRJ | 74 | Second tube: 2700 m City of Annecy | RN508 |
| F | Prado - Carenage | 2 455 | 18.09.1993 | 13 | Second tube: 2150 m. City of Marseille. Old railway tunnel | |
| F | Jocou | 2 350 | PRJ | 26-38 | Grenoble – Sisteron / Croix haute pass | RN75 |
| F | Bastia ring 1* | 2 300 | PRJ | 2B | Feasibility study | |
| F | Bobigny - Drancy | 2 220 | 1998 | 93 | Also named "Repiquet-Prefecture". Second tube: 2220 m | A86 |
| F | de Foix | 2 159 | 01.02.2001 | 09 | Second tube: in project. Ring of Foix | N20 |
| F | Montets | 1 882 | 1985 | 74 | Railway tunnel, also used by cars during winter | RN506 |
| F | Fourvière | 1 853 | 08.12.1971 | 69 | Second tube: 1836 m. City of Lyon | A6 |
| F | Epad - Puteaux | 1 850 | 1984 | 92 | Second tube: 1850 m (1993) | |
| F | Traversee de Nogent | 1 794 | 1987 | 94 | Second tube: 1485 m (1987) | A86 |
| F | Croix Rousse | 1 753 | 20.04.1952 | 69 | City of Lyon. 4 lanes | |
| F | Grands Goulets | 1 740 | 29.06.2008 | 26 | Sainte-Eulalie en Royans / Les Baraques en Vercors | RD518 |
| F | Ponserand | 1 700 | PRJ | 73 | Second tube: 1374 m (1989), one way | RN90 |
| F | Avrillè (TC Angers) | 1 700 | 24.04.2008 | 49 | Second tube: 1700 m | A11 |
| MC | Descendente ouest | 1 700 | 2003 | |||
| MC | Descendente | 1 685 | PRJ | |||
| F | Bretelle de Monaco | 1 591 | 25.05.1992 | 06 | One tube, three lanes | A500 |
| F | Siaix | 1 620 | 1990 | 73 | Natural part: 1561 m | RN90 |
| F | TC Saint Germain | 1 550 | 1996 | 78 | Second tube: 1550 m | A14 |
| F | Dullin | 1 543 | 1974 | 73 | Second tube: 1536 m (north tube) | A43 |
| F | La Grand Mare | 1 542 | 1992 | 76 | Second tube: 1518 m | RN28 |
| F-MC | Rainier 3me | 1 520 | 1993 | 06 | In France: 1180 m | RN7 |
| F | Lioran | 1 515 | 16.11.2007 | 15 | Existing tunnel (1414 m, opened in 1848) is now used for services and escape route. Altitude: 1175 m | RN122 |
| F | Ajaccio ring 1° | 1 500 | PRJ | 2A | ||
| F | Chat | 1 488 | 1932 | 73 | RN504 | |
| F | Forum Central | 1 470 | 1979 | 75 | Paris | |
| F | Vuache | 1 431 | 1982 | 74 | Second tube: 1393 m (north tube) | A40 |
| F | Major/La Joliette | 1 418 | 16.12.2002 | 13 | City of Marseille. At La Joliette tunnel (368 m, opened in 09.1994), added two cut and cover sections: 607 m til "la Major" and 443 m til "Dunkerque" | |
| F | Landy | 1 357 | 1997 | 93 | Second tube: 1354 m | A1 |
| F | Des Hurtieres | 1 198 | 1997 | 73 | Second tube: 1183 m (north tube) | A43 |
| F | Saint Germain De Joux | 1 196 | 1990 | 01 | Second tube: 1161 m (road signs: 1300-1300 m) | A40 |
| F | De la Maternitè | 1 180 | 1990 | 972 | D41 | |
| F | La Duchere | 1 128 | 1997 | 69 | Second tube: 1128 m. Lyon North Peripherique | |
| F | Bellerive-Breguet (Deviation de Roueil) | 1 117 | 1999 | 92 | Second tube: 1117 m | A86 |
| F | Col de l’Arme | 1 112 | 22.06.1979 | 06 | Second tube: 1105 m (06.1989, south tube) | A8 |
| F | Las Planas | 1 108 | 24.12.1976 | 06 | Second tube: 1072 m (16.11.1983, south tube) | A8 |
| F | Cap Sicie | 1 100 | 1993 | VP | ||
| F | Bastia ring 2* | 1 100 | PRJ | 2B | Feasibility study | |
| F | Rochecardon | 1 092 | 1997 | 69 | Second tube: 1092 m. Lyon North Peripherique | |
| F | Saint Beat – Arlos | 1 072 | 2014 | 31 | Start of works: 2004/2005 | RN125 |
| F | Bussiere | 1 055 | 21.01.2013 | 69 | Second tube: 1029 m. Balbigny-La Tour de Salvagny. | A89 |
| F | Chavants | 1 015 | 1990 | 74 | RN205 | |
| F | Mescla Nouveau | 1 014 | 1991 | 06 | City of Nice | RN1202 |
How this table is compiled
The three longest entries alone account for 30.32 km of the 124.42 km on this page, which is 24 per cent of the total from 3 of 44 rows. 22 entries sit above the median and 22 at or below it, so the table is evenly weighted and not clustered at one end.
Between the longest and the tenth-longest the drop is 8.31 km, which is the part of the table that changes when a single scheme opens. Where one of these 44 lengths disagrees with an operator's own figure for France, the table keeps the published value and notes the difference instead of averaging the two.
A new scheme in France would have to beat 11.61 km to change the head of this table, and that is the figure worth rechecking when one opens. The 44 rows for France are ordered by length, not by date, so the 2014 opening sits well down the table without being any less current.
The longest entry is 11.5 times the shortest and 6.2 times the median, which is the quickest measure of how uneven the table is. The ten longest average 6.04 km against 1.88 km for everything below them, and that ratio is the clearest thing this table says about the distribution.
Second and third place go to Duplex A86 at 10.1 km and Somport at 8.61 km. The table on this page runs to 68 rows and records State, Tunnel, Length (m), Date of opening and Dep. for each of them, which is the shape the original compiler chose rather than one imposed here.
Reading the figures
4 of the 44 measured entries exceed five kilometres, and those are the ones that carry a full ventilation and escape regime. Laid end to end the entries on this page would run 124.42 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
Roughly 15 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. Read down the dep. column, the 56 values run from 1 to 972 with a midpoint at 69; the spread rather than the maximum is what says how uneven this set is.
The longest entry is Mont Blanc / Monte Bianco, at 11.61 km, opened in 1965. 59 of the 68 rows carry an entry in the notes column — 87 per cent of the table — and that column is where the qualifications live: tube counts, closures, boundaries and the reason a figure reads the way it does.
Dated entries run from 1882 to 2014, and the busiest decade is the 1990s with 22 recorded openings. The material on this page is held in 36 captions rather than in running text, 374 words of it, each written against the image or row it belongs to by the compiler who put the page together.
The longest stands 1.51 km clear of the next longest, which is the margin to watch when a new scheme is announced. The captions name 30 distinct places and structures — France, Peripherique and Italy among them — and those names are the index into the length tables where each is recorded with its own figure.
Questions about France
What is the longest road tunnel in France?
On the figures recorded here it is Mont Blanc / Monte Bianco, at 11.61 km, opened in 1965. It heads a table of 67 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for France?
67 entries with a recorded length appear on this page, of which 44 carry traffic today and 23 are under construction or planned. The 44 in service run from 1.01 km at the short end to 11.61 km at the top, with the middle of the set around 1.87 km. The table renders 68 rows in total; the rest carry a note or a blank where a length belongs.
How far back do the opening dates go?
The earliest dated entry opened in 1882 and the most recent in 2014, so this page covers 132 years across 32 distinct opening years. A date here is the opening to traffic, which on these 54 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for France?
The median entry measures 1.87 km and the middle half of the table runs from 1.45 km to 3.19 km. The headline figure of 11.61 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in France built?
The busiest decade recorded here is the 1990s, with 22 openings, then the 2000s with 11, and 15 of the dated entries opened from 2000 onwards. That is 41 per cent of the 54 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Other pages in this section
Operators and administrations
- A86 autoroute en.wikipedia.org
This page listed 2 external addresses; one of them still holds the material they were listed for and is shown above. The other one was checked against the content of the page each leads to, not merely its status code, and did not survive it.
Cite this page
Road Tunnels in France — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/france/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length