Road Tunnels in Andorra
Tuneles en Andorra
Edited by: Eugenio A. Merzagora
6th revision – January 2016
State Tunnel (Tunel) Length (m) Date of
opening
Notes Road
AND Dos Valires 2 922 31.07.2012 Shortest tube: 2909 m. Encamp-Massana. Works start: 2005 CG2
AND-F Envalira 2 879 26.09.2002 With law-project n° 290 of 12.09.2000, France has changed with Andorra 15595 m2 of country to permit the realization of tunnel portal and viaduct CG2
AND Pont Pla (Grau de la Sabata) 1 268 07.2006 Escaldes - Engordany CG3
AND Tapia 600 24.12.2012 Sant Julia de Loria bypass CG1
AND Sant'Antoni 290   Altitude: 1920 m. Near Ordino. Second tube: 290 m CG3
AND Pedrera 150     CG3

Legenda:
Red: under costruction
Pink: in project
*: nickname

Useful Notes:
Tunel d’Envalira toll: http://www.tuneldenvalira.com/index.php/tarifas-y-descuentos/tarifas

Comments and questions to: Eugenio A. Merzagora

Home

© 2016. Copying from the data pages is not allowed without adding the source name: "The World's longest Tunnel Page"

This page was last modified on January 26, 2016