![]() |
Structures
on A 9: Ballaigues (F border) - Lausanne Brig (Simplon Pass) Edited by: Eugenio A. Merzagora 5th revision - August 2011 |
Tunnel / Viaduct | Lenght |
Lenght |
Notes |
Border CH-F. Canton VD | |||
Exit 1 Ballaigues | |||
Exit 2 Les Cles | |||
Exit 3 Orbe | |||
Connection 4 "Esser Pittet" - A1 Yverdon - Bern | |||
Section in common with A1 | |||
Connection 8 "Villars S.te Croix" - A1 Geneve | |||
Exit 9 Lausanne Blecherette | |||
Exit 10 Lausanne Vennes | |||
Exit 11 Belmont | |||
Belmont | 342 m (340) | 402 m | |
Connection 12 "La Croix" Lutry -Belmont | |||
Shell | Shell | Service Areas "Villette" | |
Chauderon | 193 m (170) | 224 m (200) | |
Criblette | 285 m (280) | 265 m (260) | |
Flonzaley | 704 m( 700) | 724 m (720) | |
Exit 13 Chexbres | |||
Connection 14 "La Veyre" - A12 Fribourg - Bern | |||
Exit 15 Vevey | |||
Exit 16 Montreaux | |||
P | - | Parking Area | |
de Glion | 1 345 m (1300) | 1 345 m (1300) | |
Chillon | 2 210 m | 2 150 m | |
Plaine du Rhone | 1 162 m | 1 162 m | |
Exit 17 Villeneuve | |||
Agip | Agip | Service Areas "Les Chablais" | |
Exit 18 Aigle | |||
Exit 19 St. Triphon | |||
Exit 20 Bex | |||
de l'Arzillier | 370 m |
450 m |
|
Rhone | 110 m |
110 m |
Canton VS-VD |
St. Maurice | 1 225 m (1200) |
1 225 m (1200) |
|
Exit 21 St.Maurice | |||
Bois Homogene | 362 m |
362 m |
|
Des Sablons | 266 m |
266 m |
|
BP-Shell | - | Service Area "Grand St. Bernard" (both direction) | |
Drance | 120 m |
120 m |
|
Exit 22 Martigny Ville | |||
Connection 23 "Gd. St. Bernard" A21 Gran San Bernardo Tunnel | |||
Exit 24 Saxon - Fully | |||
Exit 25 Riddes | |||
Rhone (Riddes) | 253 m |
253 m |
|
Lizerne SEBA | 300 m |
300 m |
|
Exit 26 Conthey | |||
Exit 27 Sion Ouest | |||
Rhone (Chandoline) | 285 m |
285 m |
|
Champsec | 710 m |
710 m |
|
Exit 28 Sion Est | |||
Borgne | 130 m |
130 m |
|
Rhone (Uvrier) | 170 m |
170 m |
|
Lienne | 720 m |
720 m |
Under river Lienne |
Exit 29 Sierre Ouest | |||
Alusuisse Crete Plane - Ancien Sierre - Plantzette | 2 450 m |
2 450 m |
Four linked tunnels: Alusuisse (1 070 m), Geronde (620 m), Crete Plane (180m), Ancien Serre-Plantzette (580m ) |
Ile Falcon | 720 m |
720 m |
|
Exit 30 Sierre Est | |||
Gorwetsch - Pfyngut | 4 220 m |
4 180 m |
three linked tunnels: Gorwetsch (1 705 m), Ermitage (380 m), Pfyngut (2 115 m) |
Exit 31 Leuk Susten Ouest | |||
Susten | 2 070 m |
2 070 m |
|
Exit 31 Leuk Susten Est | |||
Turtmann | 1 150 m |
1 150 m |
|
Aerodrome Turtmann | 190 m |
190 m |
|
Exit 32 Gampel - Steg Ouest | |||
Riedberg | 510 m |
510 m |
Open in 2009 |
Exit Gampel - Steg Est | |||
Exit Raron | |||
Raron | 920 m |
920 m |
|
Exit 33 Visp Ouest | |||
Schwarzer Graben | 3 260 m |
2 630 m |
(direction Brig : will be used Vispertal tunnel on N 212) |
Exit Vispertal Nord dir.Est | 820 m |
857 m |
|
Staldbach | 213 m |
210 m |
|
Exit Vispertal Nord dir.Ouest | 240 m |
180 m |
|
Staldbach - Grosshus (Eyholz) | 4 310 m |
4 279 m |
|
Exit 34 Visp Est | |||
Gamsen | 80 m |
80 m |
|
Gamsen | 1 021 m (1000) |
1 074 m (1050) |
|
Exit 35 Brig-Glis N19 | |||
Brig Eisenbahn | 380 m (400) |
380 m (400) |
|
Exit Brig | 280 m |
||
Connection A95 | |||
Exit 36 Ried |
Structures
on A95 (Simplon road, ex N9): Brig -Simplon Pass Gondo (I - Border) Edited by: Eugenio A. Merzagora 3rd revision - April 2003 |
Tunnel / Viaduct | Lenght |
Notes |
Connection A9 | ||
Gstipf | 215 m |
|
Pont Napoleon | 330 m |
Ried-Brig |
Exit Brig | ||
Bachtoli I� | 315 m |
|
Bachtoli II� | 155 m |
|
Ledi I� | 50 m |
|
Ledi II� | 115 m |
|
Lame | 520 m |
|
Gesterna | 110 m |
|
Bachgrabe | 255 m |
|
B�chwald | 120 m |
|
Chinnigij I� | 50 m |
|
Chinnigij II� | 100 m |
|
Pont suspendu Riederwald | 688 m |
|
Schallberg | 800 m |
465 natural part |
Schallberg | 100 m |
|
Pont du Ganter | 678 m |
|
Fronbach | 100 m |
|
Durstbach | 100 m |
|
Blaue (Rothwald) | 748 m |
Artificial |
Schallbet | 1 440 m |
Artificial / Includes Tunnels Kap I (30 m) and Kap II (140 m) |
Simplon/Kulm | 1 832 m |
400 natural part (1988) |
Engi | 1 737 m |
Artificial |
Siedegg | 353 m |
|
Krummbach | 621 m |
Arc bridge |
Hostett I� | 510 m |
Artificial |
Hostett II� | 205 m |
Artificial |
Fura | 200 m |
|
Waxel | 290 m |
Artificial |
Fura | 110 m |
Artificial |
Gabi | 70 m |
|
Alte Kaserme | 250 m |
Artificial |
Hohsteg | 350 m |
Artificial |
Sistulmatta | 1 150 m |
Artificial |
Casermetta | 645 m |
300 m natural part |
Schalbettji | 79 m |
Artificial |
Presa dForul | 525 m |
Artificial |
Italy Border |
A special warm thank to: Monica Sigismondo
Notes: (xxx) = lenght on road signal
Comments and questions to: Eugenio A. Merzagora
� 2003. Copying from the data pages is not allowed without adding the source name: "The World's longest Tunnel Page"
This page was last modified on August 31, 2011