Structures on A 9:
Ballaigues (F border) - Lausanne – Brig (Simplon Pass)
Edited by: Eugenio A. Merzagora
5th revision - August 2011
Tunnel / Viaduct

Lenght
Direction Brig

Lenght
Direction Ballaigues

Notes
      Border CH-F. Canton VD
      Exit 1 Ballaigues
      Exit 2 Les Cles
      Exit 3 Orbe
      Connection 4 "Esser Pittet" - A1 Yverdon - Bern
      Section in common with A1
      Connection 8 "Villars S.te Croix" - A1 Geneve
      Exit 9 Lausanne Blecherette
      Exit 10 Lausanne Vennes
      Exit 11 Belmont
Belmont 342 m (340) 402 m  
      Connection 12 "La Croix" Lutry -Belmont
  Shell Shell Service Areas "Villette"
Chauderon 193 m (170) 224 m (200)  
Criblette 285 m (280) 265 m (260)  
Flonzaley 704 m( 700) 724 m (720)  
      Exit 13 Chexbres
      Connection 14 "La Veyre" - A12 Fribourg - Bern
      Exit 15 Vevey
      Exit 16 Montreaux
  P - Parking Area
de Glion 1 345 m (1300) 1 345 m (1300)  
Chillon 2 210 m 2 150 m  
Plaine du Rhone 1 162 m 1 162 m  
      Exit 17 Villeneuve
  Agip Agip Service Areas "Les Chablais"
      Exit 18 Aigle
      Exit 19 St. Triphon
      Exit 20 Bex
de l'Arzillier

370 m

450 m

 
Rhone

110 m

110 m

Canton VS-VD
St. Maurice

1 225 m (1200)

1 225 m (1200)

 
      Exit 21 St.Maurice
Bois Homogene

362 m

362 m

 
Des Sablons

266 m

266 m

 
  BP-Shell - Service Area "Grand St. Bernard" (both direction)
Drance

120 m

120 m

 
      Exit 22 Martigny Ville
      Connection 23 "Gd. St. Bernard" A21– Gran San Bernardo Tunnel
      Exit 24 Saxon - Fully
      Exit 25 Riddes
Rhone (Riddes)

253 m

253 m

 
Lizerne SEBA

300 m

300 m

 
      Exit 26 Conthey
      Exit 27 Sion Ouest
Rhone (Chandoline)

285 m

285 m

 
Champsec

710 m

710 m

 
      Exit 28 Sion Est
Borgne

130 m

130 m

 
Rhone (Uvrier)

170 m

170 m

 
Lienne

720 m

720 m

Under river Lienne
      Exit 29 Sierre Ouest
Alusuisse – Crete Plane - Ancien Sierre - Plantzette

2 450 m

2 450 m

Four linked tunnels: Alusuisse (1 070 m), Geronde (620 m), Crete Plane (180m), Ancien Serre-Plantzette (580m )
Ile Falcon

720 m

720 m

 
      Exit 30 Sierre Est
Gorwetsch - Pfyngut

4 220 m

4 180 m

three linked tunnels: Gorwetsch (1 705 m), Ermitage (380 m), Pfyngut (2 115 m)
      Exit 31 Leuk – Susten Ouest
Susten

2 070 m

2 070 m

 
      Exit 31 Leuk – Susten Est
Turtmann

1 150 m

1 150 m

 
Aerodrome Turtmann

190 m

190 m

 
      Exit 32 Gampel - Steg Ouest
Riedberg

510 m

510 m

Open in 2009
      Exit Gampel - Steg Est
      Exit Raron
Raron

920 m

920 m

 
      Exit 33 Visp Ouest
Schwarzer Graben

3 260 m

2 630 m

(direction Brig : will be used Vispertal tunnel on N 212)
Exit Vispertal Nord dir.Est

820 m

857 m

 
Staldbach

213 m

210 m

 
Exit Vispertal Nord dir.Ouest

240 m

180 m

 
Staldbach - Grosshus (Eyholz)

4 310 m

4 279 m

 
      Exit 34 Visp Est
Gamsen

80 m

80 m

 
Gamsen

1 021 m (1000)

1 074 m (1050)

 
      Exit 35 Brig-Glis N19
Brig Eisenbahn

380 m (400)

380 m (400)

 
Exit Brig  

280 m

 
      Connection A95
      Exit 36 Ried

 

Structures on A95 (Simplon road, ex N9):
Brig -Simplon Pass – Gondo (I - Border)
Edited by: Eugenio A. Merzagora
3rd revision - April 2003
Tunnel / Viaduct

Lenght

Notes
    Connection A9
Gstipf

215 m

 
Pont Napoleon

330 m

Ried-Brig
    Exit Brig
Bachtoli I�

315 m

 
Bachtoli II�

155 m

 
Ledi I�

50 m

 
Ledi II�

115 m

 
Lame

520 m

 
Gesterna

110 m

 
Bachgrabe

255 m

 
B�chwald

120 m

 
Chinnigij I�

50 m

 
Chinnigij II�

100 m

 
Pont suspendu Riederwald

688 m

 
Schallberg

800 m

465 natural part
Schallberg

100 m

 
Pont du Ganter

678 m

 
Fronbach

100 m

 
Durstbach

100 m

 
Blaue (Rothwald)

748 m

Artificial
Schallbet

1 440 m

Artificial / Includes Tunnels Kap I (30 m) and Kap II (140 m)
Simplon/Kulm

1 832 m

400 natural part (1988)
Engi

1 737 m

Artificial
Siedegg

353 m

 
Krummbach

621 m

Arc bridge
Hostett I�

510 m

Artificial
Hostett II�

205 m

Artificial
Fura

200 m

 
Waxel

290 m

Artificial
Fura

110 m

Artificial
Gabi

70 m

 
Alte Kaserme

250 m

Artificial
Hohsteg

350 m

Artificial
Sistulmatta

1 150 m

Artificial
Casermetta

645 m

300 m natural part
Schalbettji

79 m

Artificial
Presa d’Forul

525 m

Artificial
    Italy Border

A special warm thank to: Monica Sigismondo

Notes: (xxx) = lenght on road signal

Road tunnels in Switzerland

Comments and questions to: Eugenio A. Merzagora

Home

� 2003. Copying from the data pages is not allowed without adding the source name: "The World's longest Tunnel Page"

This page was last modified on August 31, 2011